Sandstone Installation Process
1. Surface Preparation
- Clean the base surface thoroughly.
- Remove dust, oil, and debris.
- Ensure the base is level and strong (concrete or mortar bed is ideal).
2. Layout Planning
- Dry lay the sandstone slabs to check pattern, color variation, and sizing.
- Mark alignment lines with chalk or thread for proper placement.
3. Mixing Adhesive
- Use cement mortar (1 part cement: 4-5 parts sand) or an adhesive suitable for natural stone.
- If using for exterior or wet areas, prefer polymer-modified adhesive.
4. Applying Adhesive
- Spread mortar or adhesive on the base with a notched trowel.
- Also butter the backside of the sandstone slab to ensure full contact.
5. Laying the Sandstone
- Place the stone firmly and gently tap with a rubber mallet.
- Maintain even gaps (3-5 mm) between stone for grout.
- Use spacers if needed.
6. Leveling and Alignment
- Continuously check for level and alignment with a spirit level or straight edge.
- Adjust before mortar sets.
7. Grouting the Joints
- After 24–48 hours of curing, fill the joints using grout or cement slurry.
- Use a sponge to clean excess grout.
8. Cleaning and Sealing
- Clean the surface after installation is complete.
- Once dry, apply stone sealer to protect from stains, water absorption, and enhance the color.
Terms & Conditions
- Loading, Unloading & Transportation charges applicable accordingly.
- Material will be delivered one week after the order is placed.
- Goods once sold cannot be exchanged or return.
- Term of payment 15 days.
bottom of page